Skip to main content
All guides

Help Specifications & Scope

Upload Specifications

Upload the spec book, claim the sections that are yours, and answer what each one asks you to submit, in place.

The spec book usually arrives as a thousand-page PDF, and "what do we owe on this job" is answered from memory. Upload it once and the book becomes a register that drives your Submittal Log.

Upload the book

Start on the project's Spec setup page, which opens on the book: drop in the PDFs there, or choose Add Specification on the Specifications page. Upload the whole book at once or division by division; the title and MasterFormat section number are read from each file, and the sections roll up under their divisions automatically. A scanned book is read as well; its pages are recovered on upload so its sections work like any other.

Each PDF can be up to 250 MB. A strip above the workbench shows each file on its way, then Checking, until it lands under Uploads. A file that fails says why there; choose Remove and upload it again.

Section numbers are read whatever separator the engineer used, so 40 64 01, 40-64-01, 40.64.01 and 40_64_01 are the same section. A single-section file whose pages print no readable heading takes its number from a filename like 40_64_01 PLC Controllers.pdf. If a file came in with no sections, or with fewer than it holds, choose Detect sections again on its row under Uploads. Its sections are rebuilt, and your claims and scope lines keep their link because they follow the section number.

Load an addendum

Add an addendum the same way, on Spec setup or the Specifications page. When it restates a section, printing that section's Part 1 and Part 2 headings, its text replaces the earlier upload's. The section is read again from it, and the earlier upload is marked superseded in the section's sources. An addendum that only lists edits, such as "2.1.A: revise to read", is read after the text it amends instead of replacing it.

Either way, the section then opens with Changed by and the addendum's name: each requirement it added, removed or changed, with the old and new wording. Delete the addendum under Uploads and the earlier text comes back, the section is read from it again, and the changes the addendum made go with it.

Work one section at a time

The page is a list of the sections you own on the left, and one section on the right. Pick a section and you get everything about it in one place: its pages, what it asks you to submit, and anything that has changed it. The list is short by design, because a project owns a handful of sections rather than the two hundred in the book.

A number beside a section is how many of its submittals you have not created yet. A section that could not be read says so on itself, with the reason, rather than in a list somewhere else.

Claim what is yours

Most of a spec book belongs to other trades, so the sections that are yours come from what you provide rather than from reading it. Say what you provide on the Spec setup page: tick it from your catalog, paste your scope, or upload it as a PDF of up to 250 MB. Each line comes back with the section that specifies it, and those sections appear here once their text has been read. A section whose text could not be read yet waits until it can be, rather than being claimed on its title. Nothing you do not supply is ever put in front of you.

Each line also says who furnishes it. Only what you furnish, in whole or in part, asks for submittals. A line your subcontractor furnishes, one you only install or integrate to, and one the document names without saying who furnishes it are not listed as yours and ask you for nothing; Spec setup still shows who furnishes each one. If you do submit for your subcontractor, set the line to We furnish it.

You can still claim by hand. Open All sections to browse the whole book by division and claim a section or a whole division in one action; sections you have already decided are left alone. That is the way in for a section that specifies a system rather than a device, which no single line of supply reaches.

Run the spec check

A submittal linked to a section can be checked against it. Every datasheet on the submittal is read against the section's Part 2 and Part 3 requirements, and each requirement comes back as Meets, Does not meet, or Look at this, with the value the datasheet states and the page it is on. The check never runs on its own: pick Run spec check from the submittal's More menu, and re-run it after a part, a datasheet or the section changes. See Spec check.

Answer what a section demands

A section you furnish is read for what it requires you to submit. Its lettered items come grouped into one package per kind of deliverable: Product Data and Shop Drawings, Design Data, Test Procedures, Test Reports, Operation and Maintenance Data, Record Documents, Warranty, and Other Submittals. Each package lists the items it holds, quoted with their article references, so you can confirm they are real before acting. Items about running the job, such as notifications, meeting material, qualification statements and schedules, and items owed only on request, are left off. Answer each demand with Create, Already covered (pick the submittal you already have, then That answers it), or Not required; Undo or Restore reopens a decided demand. Take the whole section at once with Create all or None of these. A section that names nine deliverables is one decision, not nine. Your sections on Spec setup lists every section you own, and one that still has submittals to create carries Create these, which makes them as drafts. Supporting items such as test procedures and certificates are never counted as work to do; they wait under More suggested submittals in the section.

Claimed sections are what the Submittal Log reads, so what you owe on the project comes from the book instead of from memory, and a For Record requirement buried in Part 1 does not surface for the first time at closeout.

  1. Upload the book on Spec setup.
  2. Add what you provide, and file the lines that wait under File each line.
  3. Claim anything else by hand from All sections on the Specifications page.
  4. Choose Create these for each section under Your sections, or open a section in Specifications to answer its demands one by one.
  5. On a submittal tied to one of them, run the spec check to read its datasheets against the section.

Walkthrough 7 steps · 0:50 video

  1. Upload Specifications, step 1: Add a specification
    Step 1 of 7 On the project's Specifications page, choose Add Specification.
  2. Upload Specifications, step 2: Drop in the PDFs
    Step 2 of 7 Drop in the whole book or one division. Each file lists under Uploads with the sections read from it.
  3. Upload Specifications, step 3: Browse all sections
    Step 3 of 7 Most of the book belongs to other trades. Open All sections to browse it by division.
  4. Upload Specifications, step 4: Open a division
    Step 4 of 7 Open a division to see its sections.
  5. Upload Specifications, step 5: Claim a section
    Step 5 of 7 Click Claim on a section that is yours. It joins your sections on the left.
  6. Upload Specifications, step 6: Open your section
    Step 6 of 7 Open a section you own to see everything about it, including what it asks you to submit.
  7. Upload Specifications, step 7: Answer each demand
    Step 7 of 7 Answer each demand with Create, Already covered, or Not required, or the whole section with Create all.

Updated Nov 4, 2026

Can't find it? [email protected]